Scope of Services:
Design
Analysis:
1.
Master Planning to ensure "design meets functional
requirements" that decreases costs
2.
Sustainability Review for Future Growth Potential
3.
Tactical / Contingent / Strategic Planning
4.
Functional and Space Programming / Departmental
Cohesion
5.
Functional Bid Specifications for Equipment and
Software
6.
Vertical / Horizontal Transportation Studies based on Inventory
Turns to justify movement capacities
7.
Performance Reporting on Existing Functions for
Benchmarking
8.
Process Improvement Recommendations
9.
Historical Analysis for Existing Operations as
comparison for new construction requirements
10. Labor
/ Manpower Analysis for FTEs justifications against Automation Material
Handling Concepts
11. Acquisition
Assistance Review for Capital Equipment / Equipment Life Cycle Cost Analysis
12. Equipment
Design Planning / Schematic / Design / Construction Phases (not limited to)
a.
Pneumatic Tube Systems (PTS)
b.
Automated Guided Vehicle Systems (AGVS)
c.
Electric Tracked Vehicle Systems (ETVS)
d.
Selective Vertical Conveyors Systems (SVCS)
e.
Automated Storage and Retrieval Systems (ASRS)
f.
Assorted Trucks (Riders / Order Pickers / Reach /
etc.) / Tugs Vehicles / Carts
g.
Assorted Rack Configurations and Storage Configurations
(Pushback / Pallet Racks / Cantilever Racks / Double Deep / Mezzanines / Vertical
and Horizontal Carousel / Storage Bins / Platforms / Storage Cabinets
(Explosive and non-Explosive) / Selective Pallet Rack / Pallet Flow Rack /
Drive-Through / Modular Storage Rack (SpaceSaver) / etc.)
h.
Conveyor System Configurations (Power / Gravity /
Sortation Systems)
i.
Vacuum and Gravity Chutes Configuration
j.
WMS Software / RFID / Bar Code Configuration (review /
recommendations)
k.
Space Justifications / Cost Comparisons / Electrical
and Structural Documentation
13. Load
Dock / Yard / Traffic Management Studies
a.
All dock services to support inbound and outbound shipments
b.
Parking and Operational Movement of Vehicle Modeling
(non-simulation)
c.
Traffic Management to achieve EDI Scheduling
14. Supply
Chain / Logistics / Transportation Analysis
a.
Procurement Review for JIT / FIFO / LIFO
b.
Inventory Tracking Procedures / Best Practices
c.
National and International Shipping Review /
Recommendation
15. Inventory
Control Management through external WMS Software
16. Storage
and Distribution Design for receiving / breakdown / storage / distribution of
inventory
17. Waste
Management Analysis / Bio-Hazardous Management[1] /
Equipment
18. Clean
and Soiled Linen Management
19. Pharmacy
and Laboratory Design Automation
Areas Served
(but not limited to):
1.
New Construction Design
a.
Healthcare / Clinics / Medical Arts / Medical
Facilities
b.
Pharmacy / Laboratory / Central Sterile Supply /
Central Supply Loading Dock
c.
Commercial / non-Commercial Facilities
d.
Industrial Facilities / Warehouses
2.
Renovation / Modernization / Improvement Analysis
Review
a.
Healthcare / Clinics / Medical Arts / Medical
Facilities
b.
Pharmacy / Laboratory / Central Sterile Supply /
Central Supply / Loading Dock
c.
Commercial / non-Commercial Facilities
d.
Industrial Facilities / Warehouses
Standard Phasing
Breakdown:
1.
Conceptual Design
2.
Schematic Design
3.
Design Development
4.
Construction Documents
5.
Bid Assistance / Code Compliance
6.
Construction Services / Contract Bid Review
7.
User Training Management through Vendor Development
8.
Warranty / Contract Close Out
[1] RemTecH
Associates LLC maintains a Certificate of
Training in CRF 49 - ICAO (IATA) - IMO, which qualifies them to manage /
recommend design-development within Waste and Bio-Hazardous Managements
(Certification Dated: 23-Aug-2013).
RETURN TO REMTECH ASSOCIATES LLC